PMI’s safety record continued to excel as this project was completed on time with zero recordable injuries.

PMI’s safety record continued to excel as this project was completed on time with zero recordable injuries.

VCU: Services - process piping, piping fabrication, equipment installation, commissioning
Industry - healthcare

As health technology continues to evolve and move forward, Performance Mechanical, Inc. is at the forefront of construction at our healthcare institutions. The Gateway Building at Virginia Commonwealth University is a leading example of how research facilities play a significant role in enhancing human health.
Performance Mechanical self-performed all facets of the mechanical installation, included a 1,200 ton centrifugal chiller, cooling tower and over 5,000 linear feet of process piping. BIM was leveraged for clash detection that greatly enhanced the ability to complete the project on schedule.


PMI implemented these techniques to complete the boiler room conversion.

PMI implemented these techniques to complete the boiler room conversion.

Mercy College: Services - process piping, piping fabrication
Industry - higher education

Being experts at 3D modeling, prefabrication, modularization, and just-in-time delivery for the more technical industries, PMI has compiled a distinctive advantage in the market. The BIM process allows our team to prefabricate and modularize a large percentage of the piping systems. This translates into a savings to the owner by minimizing the cost of work, site headcount, site laydown space requirements and project duration. Additionally, for systems that require 3rd party or city inspection, the modules are pre-tested and inspected prior to installation, giving the site team the confidence to proceed with successor installations without setbacks.


PMI was well positioned to install replace the 40,000 CFM Custom Air Handling Unit

PMI was well positioned to install replace the 40,000 CFM Custom Air Handling Unit

Chambersburg: Services - sheet metal, process piping
Industry - healthcare

When Chambersburg Hospital needed assistance with its Air Delivery systems, this leading healthcare provider chose Performance Mechanical. The construction schedule dictated that all construction activity was completed within a 36-hour window. 
With the support of a joint venture established just for this project, our team helped manage every aspect of the installation including steel erection to mechanical installation and commissions. The project was completed safely, on budget and ahead of schedule, and delivering quality and performance the Performance Mechanical way to complete the project on schedule.